Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

The City of Molina de Segura invests 265,000 euros in improvement and adaptation works in the public schools of the municipality (23/07/2019)

The City of Molina de Segura carries out various improvement works in public schools in the municipality for an amount of 265,000 euros, as reported by the Councilor for Education and Municipal Works, Fuensanta Martínez Jiménez.

Of the investment made, 170,000 euros correspond to the Participatory Budgeting item, and 95,000 euros to the investment item in teaching centers of the Municipal Budget, destined to adaptation and improvement works in the public centers of the second cycle of Infant and Primary Education of the municipality.

These are 33 actions, which are the following:

SCHOOL

WORK

one

THE PUREST

Waterproofing of children's canopy cover.

two

THE SIPHON

Interior painted ceilings and vertical parameters.

3

MIÑANO GREGORY

Paint the interior corridors of primary.

4

MASTER FCO.

MTNEZ.

BERNAL

Interior painted ceilings and vertical parameters.

5

SACRED HEART

Interior painted ceilings and vertical gym parameters.

6

FATIMA

Waterproofing of the entire terrace corridor in the skylight area with fiber.

7

FATIMA

Cleaning room reform.

8

TIERNO GALVÁN

Water filtration repair on deck.

9

TIERNO GALVÁN

Make a casket on the covered track with rainwater channeling outwards.

10

TIERNO GALVÁN

Repair of children's games.

eleven

SAN ANTONIO

Roof waterproofing.

12

THE MEDICINES

Conditioning of premises for the school garden workshop.

13

MILL FIELD

Repair of leaks in the sports hall.

14

THE SIPHON

Construction of emergency exit door.

fifteen

MASTER FCO.

MTNEZ.

BERNAL

Renovation of children's toilets.

16

THE PUREST

Pave a small area that connects the access door to the center with the corridor.

17

THE ROMERAL

West courtyard paving next to the health center.

18

VEGA DEL SEGURA

Reform of the changing rooms and toilets of cooks.

19

VEGA DEL SEGURA

Change toilet floors of students and teachers

twenty

SAN MIGUEL

Replacing a porch deck between buildings in the primary courtyard.

twenty-one

SAN MIGUEL

Repair and paint the floor cracks at the end of the covered track.

22

MIÑANO GREGORY

Door replacement.

2. 3

CERVANTES

Adaptation of changing rooms.

24

WALK ROSALES

Fix floor of the upper outdoor terrace and fix grilles and tiles of the outer patio to access the center.

25

VEGA DEL SEGURA

Replace fencing between playground and sports court.

26

FATIMA

Tiling of the assembly hall.

27

CONSOLATION

Painting.

28

MASTER FCO.

MTNEZ.

BERNAL

Remove slope and wax.

30

SAN MIGUEL

Repair the soccer and basketball court.

31

MASTER FCO.

MTNEZ.

BERNAL

Mulberry area paving.

33

TIERNO GALVÁN

Paving with concrete slab in main courtyard.

The Councilor for Education recalled that "all these investments are carried out with the budget of the City of Molina de Segura, since, one more year, the investments made by the Ministry of Education in the Molinense teaching centers are practically non-existent. If the Public schools in Molina de Segura stand out for the quality of their facilities, thanks to the effort made by the City Council, while the Regional Government submits us year after year to an obvious abandonment in terms of educational investments. "

Source: Ayuntamiento de Molina de Segura

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información