Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

Log in operation in testing the new drive north of Molina and Pump Station Wastewater (EBAR) The Romeral (06/04/2011)

The commissioning test phase of the North Drive Pump Station Molina and Wastewater (EBAR) The Romeral took place on Wednesday April 6 in Molina de Segura, as has been shown in situ by the Mayor of the town Eduardo Contreras Linares, and the Minister of Agriculture and Water in the Region of Murcia, Antonio Cerdá Cerdá.

In this first phase were incorporated into the General System of collectors Zona Norte de Molina de Segura wastewater from the La Quinta and Altorreal area, which downloads the urban area of ​​the site of a large volume of wastewater this entire area north of the town, which now go directly to the main sewage Campotéjar.

This means, among other improvements, energy savings and the elimination of Altorreal purification and increase the capacity of waste water, residual and rainwater in the urban area of ​​the city.

In a forthcoming next phase will be incorporated into EBAR The Romeral wastewater from El Morcillo Chorrico and Canada.

Molina Drive and north of Pump Station Wastewater (EBAR) The Romeral is one of five projects under the General System of collectors of town and has consisted of a section driven and EBAR The discharge pipe has a length of 5,537 meters and also has a thick shaft, automatic roughing screens, regulation tank of 4,000 m3, cleaning nozzles, agitators, well pump and electrical panel.

Source: Ayuntamiento de Molina de Segura

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información