Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

The City of Molina de Segura 889,361.07 euros invested in the new Plaza de Europa (18/03/2014)

The opening ceremony of the new Plaza de Europa in Molina de Segura takes place TODAY Tuesday, March 18th, at 19.30 pm in San Juan Street (opposite the Calle de Aragón Molina).

Presides over the ceremony the Mayor of the town, Eduardo Contreras Linares, accompanied by Councilman Public Road, Vicente Fernández Oliva, and the Councillor for Economy and Open Government Procurement, Victoria Gomez Alcazar.

To mark the opening of this new public facilities, the City Council has organized a program of events, develop throughout the day:

From 10.00 to 13.30, in the Plaza de Europa, Mobile Classroom informative campaign are Europe, the Directorate General of the European Union and Foreign Affairs of the Ministry of the Presidency of the Region of Murcia.

12.00 to 13.00 pm in the auditorium of the IES Vega Tader (Avenida Gutierrez Mellado) briefing on Europe for secondary students.

At 1300 hours, in the Plaza de Europa, Outsizers traveling performance group.

From 18.00 to 19.00 in the Sports Centre Tennis Europe Square, sporting clubs exhibitions by the municipality (Female soccer, figure skating and martial arts).

Coordinates: Association Athlete Molina.

At 1930 hours, the opening ceremony of the new Plaza de Europa and Rex and Sanchez tribute to pioneers of industrial town.

Assists the Mayor of the town, Eduardo Contreras Linares.

At 2030 hours, in the Plaza de Europa, musical entertainment by the Outsizers group.

At 2100 hours, in Europe Square, concert No Property Group.

The development works of the Plaza Europa have been made by the company have included PAVASAL and management of this area as green space delimited according PGMOU, which has a total area of ​​6,790 m2 for the use and enjoyment of residents neighborhood.

The new space has been defined in three broad areas of action, based on recreational, cultural, and recreational criteria, given the extent of the treatment area.

It has created a first upper area sports and child-playful, with the Triumph Street area equipped with a large Children's Area 237 m2, divided into two areas by age.

Around this area, there is a square room like area with trees, lighting, street furniture and cobblestone pavement type.

Next to the playground, and still on the first concourse, has created a sports facility of 924 m2, one protected by a perimeter wall of 5 m track.

height to avoid conditions with other users of the area to stay.

In total, the top platform, with sitting areas, playground and sports area, covers an area of ​​2,433 m2.

The central area, recreational or performance area, a plaza paved with flagstone pavers, street furniture and lighting, which freezes area stay and supports cultural activities such as concerts, traditional dances, installation of booths for samples, etc..

It has an area of ​​680 m2, and its central area was reflected with pavement, the flag of the European Union, with stars features.

To overcome the differences between each platform, a low wall built of stone mampuesta management with a precast concrete serves as the bench seat.

The buffer zone between platform has native trees and shrubs for shade.

The third area, a lower room, next to the Assumption Street, is also formed by the low wall separating the management of pending transitions parterre.

It is paved with cobble range, regarding artificial gravel and gravin.

This space has trees, street furniture, informational signs of use, etc.., And has an area of ​​1,120 m2.

Perimeter at three platforms have been built connecting rides all three platforms, ensuring accessibility and allowing the entry of emergency vehicles, maintenance, etc..

This space has a total of 475m2.

In perimeter parkland and actions across platforms, has done important work of environmental improvement with parterres of 5 m.

wide, where they have planted a large number of shrubs, plant flowers and trees, and to improve the integration of environmental performance (total 1,402 m2).

Also, prior to the execution of the organization and flooring, have identified a number of services, such as water supply, sanitation and storm, it should be left installed in anticipation of future needs and the needs existing in order to provide areas with water points, irrigation.

In an earlier phase, the entire perimeter sidewalks Conditioning (680 m2), flood protection wall and lighting, as well as the management and improvement of road safety in streets Triunfo, San Juan and Asuncion was performed, settling in underground containers Assumption Street (3 modules 3 underground containers).

Throughout the entire process, from the filling of the site, rebuilding sidewalks to its original state, building enclosure to prevent flooding and management of the interior, there have been actions amounting to 889,361.07 euros.

Source: Ayuntamiento de Molina de Segura

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información