Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

Grand opening of the new indoor sports pavilion IES Francisco de Goya de Molina de Segura (18/06/2008)

The opening ceremony of the new Indoor Sports Centre IES Francisco de Goya de Molina de Segura was held on Wednesday 18 June, chaired by the Mayor of the town, Eduardo Contreras Linares.

Also attended by the Councillor for Sports, Jesus Maeso Monge, Councillor of Municipal Works, Daniel Soltero Chaves, Councillor of Education, Mariola Martinez Robles, and the Director of IES Francisco de Goya, Amparo Aloy.

The works have been made by the company Trimtor, SA for an amount of 1,056,107.94 euros.

Funding for the City of Molina de Segura and the Autonomous Community of Murcia, under the Cooperation Agreement between the city of Molina de Segura, the Presidential (General Directorate of Sports) and the Ministry of Education, Science and Research.

The Autonomous Community has contributed 350,000 euros (175,000 each of the ministries mentioned above), the Higher Sports Council € 100,000, and the remaining amount was provided by the City Council.

The construction of the new pavilion occupies an area of 1677.75 m2 and is located next to the Instituto Francisco de Goya.

The total constructed area is 1582.75 m2.

Its shape is rectangular and its uneven topography.

The sports facilities will serve the students of Secondary School Francisco de Goya, during school hours and will meet the demands of athletes and users in non-school hours.

Formally, the building has a compact monolithic appearance to the outside, trying to counter the vandalism spirit aroused in some conventional window openings.

Thus, the gain natural light and ventilation are concentrated on the decks.

Constructive solutions are simple and easy to maintain, requiring high technology for conservation.

The track has a side room equipped with external stairs.

The building has a metal structure, both in the dressing room area and in the track.

The cover of the track has been made with sandwich plate of 50 mm and was sandwiched translucent polyester double plate at a rate of approximately 12% of its surface.

The roof of the dressing is similar.

The renewal of air is done through two systems: natural ventilation (installation of adjustable gates opposite facades and addressing the prevailing winds, which facilitates the movement of the game space crusade. It also has air vents that allow air renewal a constant shape), and by forced ventilation (exhaust mechanical coil).

Inside the pavilion has been built with panels phonic strips, to contribute to the attenuation of reverberations.

The pavilion has the following dependencies:

Indoor sports hall, internal dimensions 44x25x7'70 meters in height, illuminated from above and ventilation.

It features tracks drawn from central and cross-track option, become independent by separating curtains.

Dressing: a rectangular body and 4 meters high, attached to the front of the pavilion in the north.

Other Dependencies: Lobby, Control, Engine Room, Fitness room, sports store with direct access from the track and kit.

Source: Ayuntamiento de Molina de Segura

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información