Portal de Molina de Segura

www.portaldemolina.com

Molina de Segura - SpanishMolina de Segura - English
detail of Molina de Segura

 

The Jesuit Father streets and station Hernández Pérez Molina de Segura have a new drainage system will improve the general sanitation of the center (11/12/2008)

The works for the collector Project General Sanitation Service in the streets and Jesuit Father Hernández Pérez Molina de Segura Station have begun this week in the stretch for Station Street, between Avenue of Industry and Professor Calle Joaquín Abellán, as reported in a press conference today, Thursday 11 December, the Mayor of the town, Eduardo Contreras Linares, the Minister of Agriculture and Water in the Region of Murcia, Antonio Cerdá Cerdá, and the Director General of Water, Miguel Angel Ródenas Cañada who have visited the work later.

The collected works of installation of a large collector to clean up concrete pipe of 800 mm.

in diameter, rooted at the intersection of Main Street to Station Street and charted by Jesuit Father Calle Hernández Pérez, Professor Joaquin Abellan and Station Street, the great collector evacuated existing Industry Ave.

This new collector will allow improving the evacuation of the contributions of the reorganization of the entire downtown area, from Avenida de Madrid, Calle Mayor, Calle San Juan, Calle San Francisco, Calle Menéndez Pelayo and upland areas of the town of Molina de Segura.

The new collector has a length of 500 m.

and will be in reinforced concrete pipe of 800 mm.

in diameter, doubling the capacity of currently existing collector Street Station.

This collector will reduce the bulk of contributions to Station Street, resulting in improved maintenance of this network, thus improving the quality of sanitation services throughout the downtown area and allowing a greater capacity for evacuation.

The works have an amount of 500,000 euros and were financed by the Ministry of Agriculture and Water, through the Directorate General of Water.

On the occasion of the works on Tuesday, December 9 traffic was cut off Station Street.

The section affected by the traffic court is between Avenue of Industry and Professor Joaquín Abellán Street.

The traffic from the Avenue of the industry to the rest of the Street Station is not affected by the works by Jara Carrillo Street or by Professor Joaquín Abellán Street.

Source: Ayuntamiento de Molina de Segura

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información